Project Architect:
Sandover Pinder
Location:
Cresswell Road, Yokine, Perth Western Australia

Carmel High School Innovative Learning Centre Perth Western Australia

Project Architects: Sandover Pinder

This recently completed project will help you understand the benefits of our 74mm polycarbonate system. Everbright E610 Clear was used recently at Carmel High School on Cresswell Road,Yokine, Perth WA.

For this new development E610 was used flat and our panels were set at a 2 degree pitch. E610 free spanned 4.25mtr incorporating Locking System LS2.2. Locking system LS 2.2 simply means there are 2 aluminium locking bars required out of every 6 chambers. See design loads, which shows you in more detail the different locking systems available.

These panels were extruded, and supplied in one complete 4.95mtr length and in 600mm wide configurations.

For this project the specification was for the panels to be supplied in one complete length and two small areas were to be cut down to length on site.
Due to our system being manufactured as 100mm tubes alterations can easily be made on site and panels broken down when required.
Our panels simply clip together making the installation process very rapid, as our product only requires to be joined every 600mm on site.
Delivered to site were 52 panels, and the total area was approximately 154 square meters.
Installation time for this project was two days, and there were two tradesmen available on site.

The design brief was for a product that could minimize structural requirements, be fully trafficable and have a long life span.
Our system was ideally suited for a project of this nature, due to E610’s free span capabilities, durability, and panel strength.
For developments of this nature E610’s additional benefit, is that in the unlikely event of students climbing on the roof or even falling from a big height, our polycarbonate system will not break or the joints separate. Making E610 one of the strongest translucent materials available in the world today.
Several other key factors were for a product that was rapid to construct, therefore keeping disturbance down to a minimum.
The Everbright E610 panels only needs to be joined every 600mm on site this makes the installations process very rapid.
Our 74mm polycarbonate system gives a unique visual appearance and modern uniformed look making use of all the natural light available.
All these factors made our system a excellent and obvious solution for this development.
Clear was the colour selected due to a 73 percent light transmission for visible light and a thermal performance of 1.85W/m"K.

E610 LS2.2 Weight and dead load calculations;
Locking System LS2.2 = 14 kg/sqm with a dead load of 0.101kN/sqm.
See design loads, which shows you in more detail the different locking systems available.
E610 polycarbonate panels incorporate as standard detailing an excellent safety factor. All loading criteria are based on 0.75kN/sqm and a 50% safety factor as part of a standard specification detailing.

Makrolon 1243 is the material used in our polycarbonate roofing system, which is part of the worldwide Bayer Group.
Everbright E610 comes with a manufacture’s worldwide 10 year warranty and the panels have a life expectancy in excess of 35 years.

Our polycarbonate system give a seamless and continuous line, with no steel frame work spoiling the visual effect. E610 Integral locking bars hide the aspect of where a panel starts and where it finishes, so it becomes a continuous system giving a uniformed and conformed design feature. Creating an architectural flare, that isn't possible with any other polycarbonate system available on the market. Our system only needs to be secured with washer and screw fixings provided to both the lower and higher end of the panels, all the joints are self sealing once the integral locking bar is fitted. Other systems would necessitate the need for a framed grid work support system across the entire roof.

We can advise that there was a cost saving on the structure requirements with our system on this project. Since less structure is required, less shadows are created, and as such the natural light translucency is at it's full potential. Since less structure was required it maximized all the natural light elements, which was of paramount importance on this development.

As you can see from the images contained in this section, E610 is a very light weight product, that can be easily handled on site during the installation process. Our 74mm polycarbonate panels are also fully trafficable, which makes a huge difference to construction time, and helps with general service and maintenance.

The construction process with E610 is very simple and is less time consuming to install on site.

Everbright E610 major advantages at a glance:

  • Rapid installation
  • Superior free span (see design loads)
  • Can be extruded to a maximum 20.5mtr
  • Minimal additional structure required with our system
  • Strongest translucent material in the world (74mm profile)
  • 100% fully trafficable
  • Passed the AS1562.3-2006 sand bag test
  • Impact resistance
  • Intruder resistance
  • Cyclone rated
  • Superior thermal/ acoustic performance
  • Long life span
  • Coextruded UV protection layer
  • Australian manufactured
  • Unique jointing arrangement
  • Self cleaning dome shape
  • Light weight product

This project is located at Cresswell Road, Yokine, Perth, Western Australia
The project can be viewed should site visits be required and adequate notice is given.

The Installation Visually

  • Development from Cresswell Road

    Development from…

  • Development from rear

    Development from rear

  • Development from rear

    Development from rear

  • evelopment from rear

    evelopment from rear

  • View front Everbright roof

    View front Everbright…

  • View below Everbright roof

    View below Everbright…

  • View below ground level

    View below ground…

  • View below ground level

    View below ground…

  • View below 1st floor right

    View below 1st floor…

  • View below 1st floor right

    View below 1st floor…

  • 4.25mtr free span

    4.25mtr free span

  • Minimal structural requirements

    Minimal structural…

  • Uniformed deign feature

    Uniformed deign…

  • View below 1st floor left

    View below 1st floor…

  • Modern clean look

    Modern clean look

  • Less structure less shadows created

    Less structure less…

  • Translucent maximises natural light

    Translucent maximises…

  • View below ground level

    View below ground…