NIB Stadium Translucent Dug Outs Perth Western Australia

2mtr free span

This recently completed project will help you understand the benefits of our 74mm polycarbonate system and showcases it's suitability for commercial developments.

This recently completed project will help you understand the benefits of our 74mm polycarbonate system and showcases it's suitability for commercial developments. Everbright E610 Opal was installed recently at the NIB Stadium Perth on the two translucent dug outs. These new translucent dug outs incorporated the Everbright E610 polycarbonate system, which free spanned 2mtr, incorporating locking System LS1. See design loads, which shows you in more detail the different locking systems available. These panels were supplied in complete length of 2mtr x 10mtr x 2 off. Total project size 40sqm.

Installation time for this project was one day and there was two tradesmen available on site to do the associated works.

The design brief for this development was for a modern looking translucent product, that could minimize structural requirements and have a long life span. The client's specifications were for a product that was self cleaning, impact resistance, had superior thermal and acoustic performance characteristics. Another key factor was for a product that was rapid to construct, in order to keep the disruption down at the stadium to a minimum.

The Everbright E610's increased free span capabilities, made our polycarbonate system an excellent choice for this project giving the desired effect, as it is one of the strongest translucent materials available in the world today.

Our premiére product enhanced this development with its clean modern look and provides a comfortable environment for all the clubs that used this venue. Our 74mm polycarbonate system gives a unique visual appearance and modern uniformed look making use of all the natural light available.
Opal was the colour selected due to a 65% percent light transmission for visible light.

The Everbright E610 panels only needs to be joined every 600mm on site this makes the installations process very rapid.

Our polycarbonate system give a seamless and continuous line, with no steel frame work spoiling the visual effect. Everbright E610's integral locking bars hide the aspect of where a panel starts and where it finishes, so it becomes a continuous system giving a uniformed and conformed design feature. Creating an architectural flare, that isn't possible with any other polycarbonate system available on the market. Our system only needs to be secured with washer and screw fixings provided to both the lower and higher end of the panels, all the joints are self sealing once the integral locking bar is fitted.

Makrolon 1243 is the material used in our polycarbonate roofing system, which is part of the worldwide Bayer Group. Everbright E610 comes with a manufactures worldwide 10 year warranty and the panels have a life expectancy in excess of 35 years.

The construction process is very simple and is less time consuming to install on site. We can advise that there was a significant cost saving on the structure requirements with our system on this project.

Everbright E610 polycarbonate panels incorporate as standard detailing an excellent safety factor. All loading criteria are based on 0.75kN/sqm and a 50% safety factor as part of a standard specification detailing.

Unique appearance

Everbright E610 major advantages at a glance:

  • Rapid installation
  • Superior free span (see design loads)
  • Can be extruded to a maximum 20.5mtr
  • Minimal additional structure required with our system
  • Strongest translucent material in the world (74mm profile)
  • 100% fully trafficable
  • Passed the AS1562.3-2006 sand bag test
  • Impact resistance
  • Intruder resistance
  • Cyclone rated
  • Superior thermal/ acoustic performance
  • Long life span
  • Coextruded UV protection layer
  • Australian manufactured
  • Unique jointing arrangement
  • Self cleaning dome shape
  • Light weight product

This project is located at NIB Stadium 310 Pier St, Perth, Western Australia
The project can be viewed should site visits be required and adequate notice is given.

The Installation Visually

  • Everbright aluminium profiles

    Everbright aluminium…

  • Modern uniformed look

    Modern uniformed look

  • Minimal structure

    Minimal structure

  • 2mtr free span

    2mtr free span

  • Simple construction

    Simple construction

  • During construction

    During construction

  • Development above

    Development above

  • Superior thermal performance

    Superior thermal…

  • 67% light transmission

    67% light transmission

  • High quality finish

    High quality finish

  • Unique appearance

    Unique appearance

  • Screw less fixing method

    Screw less fixing…